Skip to content
Snippets Groups Projects

Repository graph

You can move around the graph by using the arrow keys.
Select Git revision
  • 2.8
  • 2.9
  • 3.0
  • 3.1
  • 3.2
  • 3.2_backported
  • 3.3
  • 3.3_backported
  • 3.4
  • 3.4_backported
  • 3.5
  • 3.5_backported
  • 3.6
  • 3.6_backported
  • 3.7
  • 3.7_backported
  • 3.8
  • 3.8_backported
  • 3.9 default
  • 3.9_backported
  • 6.0.4
  • 6.0.3
  • 5.0.7
  • 6.0.2
  • 6.0.1
  • 5.0.6
  • 6.0.0
  • 5.0.5
  • 6.0.0-rc
  • 5.0.4
  • 6.0.0-beta
  • 5.0.3
  • 4.0.6
  • 5.0.2
  • 5.0.1
  • 4.0.5
  • 5.0.0
  • 4.0.4
  • 5.0.0-rc2
  • 5.0.0-rc1
40 results
Created with Raphaël 2.2.01Aug31Jul30292827262524232221201918171615141312111098765432130Jun29Fix: function length_accountg has been moved in getNomUrlFix travis errorStart to work on using the jquery date selector.Merge branch 'develop' of git@github.com:Dolibarr/dolibarr.git into developAdd field fk_user in bookkeeping (the user who valiated the accountingFix combo for multicompany not visible where there is other hooks byFix code commentDebug view of services linesFix look and feel v6Fix personal conf was not loadedfix :add missing hook into product price cardMerge branch 'develop' of https://github.com/Dolibarr/dolibarr.git intoFix filter of project in timespent viewFix filter lostFix by adding a MULTICOMPANY_BACKWARD_COMPATIBILITY option.Fix on filter on project listFix bad targetFix missing translation keysFix cssMerge branch '5.0' of git@github.com:Dolibarr/dolibarr.git into 6.0Merge branch '4.0' of git@github.com:Dolibarr/dolibarr.git into 5.0Merge branch '6.0' of git@github.com:Dolibarr/dolibarr.git into 6.0Merge pull request #7113 from atm-ph/new_develop_expense_reportMerge pull request #7215 from aspangaro/6.0-d1Merge pull request #7216 from atm-florian/fix_7213Merge pull request #7207 from atm-quentin/FIX_next_situation_load_extrafieldsMerge pull request #7205 from atm-quentin/6.0Merge pull request #7197 from hregis/6.0_cronMerge pull request #7191 from hregis/4.0_bug3Fix cssMerge branch '6.0' of git@github.com:Dolibarr/dolibarr.git into developSome fix for better compatibilityFix menu editorNEW Add Next/Previous button on operation date of bank lineAdd possibility to propose last num releve in conciliationFix better way to get info for contact/thirdparty on agendaFix error method on non objectFix in agenda output per user/type (reduce memory usage)Fix project edition on loan menuFix flex problems
Loading